Timeless elegance, perfectly refined
An overview of selected restoration projects
Our projects are more than restorations – they are investments in timeless beauty and lasting conservation of value. With unwavering precision and incomparable craftsmanship, we transform classic vehicles into exquisite, unique pieces. Each vehicle tells its own story, and we are proud to be part of that story.
Discover a small, exclusive selection of our outstanding customer projects. Discretion is very important to us, and we only show selected vehicles whose owners have agreed to present them here.
356 Pre-A Speedster
- Complete disassembly to bodyshell
- Accident damage detected in front
- Body stripped of paint by water jet cleaning
- Vehicle aligned on frame gauge
- Repair of front damage
- Body restored mostly with crafted metal sheets
- Correction and optimization of surfaces and clearances
- In progress: Completion of bodywork / painting / technical overhaul / finalization
1951 356A T1 Speedster
- Sorting and inspection of existing parts
- Body blasting, cleaning and rust removal
- Body restoration on frame gauge
- Crafting of sheet metal parts
- Aluminum GT trunk lid
- Correction and optimization of surfaces and clearances
- Painting in shade 701 – Black
- Refurbishing existing attachment parts and design elements
- Procuring replacements for defective or missing parts
- Reupholstery and covering interior with leather according to customer requirements
- GT brake
- Enhanced-performance motor
- In progress: Last steps of finalization
550 RS Spyder
- Disassembly of attachment parts
- Assessment
- Removing wrong aluminium sheet parts
- Exposing original substance as well as original paint by dry ice cleaning
- Careful repair of original substance
- Crafting of type-appropriate parts for missing components
- In progress: Completion of bodywork / painting / technical overhaul / finalization
356B Carrera 2 Convertible
- Complete disassembly to bodyshell
- Accident damage detected in front and rear
- Body stripped of paint by water jet cleaning
- Partially blasted and derusted
- Body repaired on the frame gauge
- Careful repair of original substance
- Original undercarriage restored
- Painted in original shade 6204 – Ivory
- Completion with maximum preservation of original substance
- Refurbishing all attachment parts and design elements
- Refurbishing all rubber parts
- Refurbishing and repairing original upholstery and interior fittings
- Use of original soft top after refurbishment
- Technical overhaul
- Sealing and appraisal
- Completed in 2024
718 – RS61 Spyder
- Careful manual paint stripping of the aluminum body
- Minor damages in the front section and underbody smoothed out
- Alignment of lids and doors optimized
- Paintwork in the original color according to the period-correct standard
- Vehicle reassembled
- Completed in 2023
356B Super 90 D’leteren Roadster
- Disassembly of attachment parts and drive train
- Vehicle stripped of paint by hand
- Underbody cleansed by dry ice cleaning
- Body restoration on frame gauge
- Correction and optimization of surfaces and clearances
- Painted in original shade 6011 – Signal Red
- Technical overhaul
- Completing and refurbishing all attachment parts and design elements
- Sealing and appraisal
- Completed in 2022
356A Speedster (Bruce Jennings)
- Complete disassembly to bodyshell
- Body completely stripped, blasted and derusted
- Body overhaul and restoration on frame gauge
- Correction and optimization of surfaces and clearances
- Painted in original shade 5704 – Ivory
- Completion and technical overhaul
- Refurbishing all attachment parts and design elements
- Interior and soft top reupholstered and covered with leather
- Sealing and appraisal
- Completed in 2019
356B Carrera 2 GS Coupé
- Disassembly of attachment parts and drive train
- Vehicle stripped of paint by hand
- Underbody cleansed by dry ice cleaning
- Correction and optimization of surfaces and clearances
- Painted in original shade 601 – Signal Red
- Crafting and adapting oil lines and oil cooler baffles
- Completing and refurbishing attachment parts and design elements
- Completed in 2018